Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 312112 | Bottled Water Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0030 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $60,028 | $83,001 | n/a |
NT0030 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,406 | $4,553 | n/a |
NT0030 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,850 | $0 | n/a |
NT0030 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $510 | $0 | n/a |
NT0030 # 05 Y:2024 | 05 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $82,128 | $10,000 | n/a |
NT0030 # 06 Y:2024 | 06 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $373 | $1,424 | n/a |
NT0030 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,747 | $1,279 | n/a |
TT0318 # 08 Y:2024 | 08 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,783 | $460 | n/a |
TT0318 # 07 Y:2024 | 07 | 2024 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,912 | $15,000 | n/a |
TT0318 # 06 Y:2024 | 06 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $5,885 | $12,180 | n/a |
TT0318 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,815 | $1,500 | n/a |
TT0318 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,027 | $65,640 | n/a |
TT0318 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,101 | $94 | n/a |
TT0318 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $25,497 | $30,000 | n/a |
TT0318 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $519,539 | $7,626,292 | n/a |
CC0035 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,865 | $0 | n/a |
CC0035 # 05 Y:2024 | 05 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,795 | $2,800 | n/a |
CC0035 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,601 | $4,550 | n/a |
CC0035 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,484 | $1,000 | n/a |
CC0035 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,395 | $4,578 | n/a |
CC0035 # 01 Y:2024 | 01 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,534 | $7,000 | n/a |