IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 312120 Breweries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0490 # 03 Y:2020 03 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,008 $12,000 Not Implemented
LE0490 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,376 $10,000 Not Implemented
LE0490 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,924 $40 Implemented
LE0490 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $1,370 $4,000 Implemented
LE0490 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,681 $5,750 Implemented
LE0490 # 06 Y:2020 06 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,572 $60,000 Implemented
LE0490 # 07 Y:2020 07 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,005 $35,000 Not Implemented
LE0490 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,133 $15,000 Implemented
WV0473 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,047 $31,578 Not Implemented
WV0473 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $29 Implemented
WV0473 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,907 $8,793 Not Implemented
WV0473 # 03 Y:2013 03 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,804 $1,700 Implemented
WV0473 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,703 $1,000 Implemented
WV0473 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,539 $7,466 Implemented
WV0473 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $2,574 $3,281 Implemented
WV0473 # 07 Y:2013 07 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,724 $617 Not Implemented
WV0473 # 08 Y:2013 08 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,529 $3,263 Not Implemented
WV0473 # 09 Y:2013 09 2013 DEVELOP A REPAIR/REPLACE POLICY $497 $566 Implemented
LE0262 # 15 Y:2007 15 2007 INSTALL OCCUPANCY SENSORS $25,575 $11,250 Not Implemented
LE0262 # 14 Y:2007 14 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $1,804 $535 Not Implemented
LE0262 # 13 Y:2007 13 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,168 $1,000 Not Implemented
LE0262 # 12 Y:2007 12 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,980 $1,400 Not Implemented
LE0262 # 11 Y:2007 11 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,066 $4,000 Not Implemented
LE0262 # 10 Y:2007 10 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,332 $2,000 Not Implemented
LE0262 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $9,758 $960 Not Implemented