IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 312120 Breweries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0226 # 10 Y:2023 10 2023 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $56,102 $91,218 Implemented
DL0226 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,355 $9,585 Implemented
DL0226 # 08 Y:2023 08 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,284 $3,000 Not Implemented
DL0226 # 07 Y:2023 07 2023 REDUCE VENTILATION AIR $1,643 $57 Implemented
DL0226 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,451 $0 Implemented
DL0226 # 05 Y:2023 05 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,421 $3,000 Not Implemented
DL0226 # 04 Y:2023 04 2023 REDUCE VENTILATION AIR $2,739 $0 Not Implemented
DL0226 # 03 Y:2023 03 2023 ADJUST VENTS TO MINIMIZE ENERGY USE $2,053 $0 Implemented
DL0226 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $1,234 $0 Implemented
DL0226 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,718 $0 Implemented
DL0137 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $745 $160 Not Implemented
DL0137 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $1,040 Not Implemented
DL0137 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,820 $10,075 Not Implemented
DL0137 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $245 $2,280 Not Implemented
DL0137 # 08 Y:2014 08 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $970 $1,200 Implemented
DL0137 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $2,350 $6,300 Implemented
DL0137 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,520 $8,430 Not Implemented
DL0137 # 04 Y:2014 04 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $890 $2,220 Not Implemented
DL0137 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,900 $38,400 Not Implemented
DL0137 # 02 Y:2014 02 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $14,240 $5,460 Not Implemented
DL0137 # 01 Y:2014 01 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $17,190 $20,000 Implemented
DL0015 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,000 $400 Not Implemented
DL0015 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,249 $18,000 Implemented
DL0015 # 09 Y:2008 09 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,970 $10,000 Not Implemented
DL0015 # 08 Y:2008 08 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $15,400 $27,000 Not Implemented