Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
140
matching recommendationsNAICS | 312230 | Tobacco Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0412 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,422 | $1,980 | Not Implemented |
MI0412 # 04 Y:2022 | 04 | 2022 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,603 | $6,042 | Not Implemented |
MI0412 # 03 Y:2022 | 03 | 2022 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $9,634 | $2,055 | Not Implemented |
MI0412 # 02 Y:2022 | 02 | 2022 | ELIMINATE/REDUCE AN OPERATION | $73,444 | $22,400 | Not Implemented |
MI0412 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $126,797 | $24,547 | Not Implemented |
TT0230 # 04 Y:2019 | 04 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,630 | $30,000 | Not Implemented |
TT0230 # 06 Y:2019 | 06 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $2,786 | $10,000 | Not Implemented |
TT0230 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,000 | $6,000 | Not Implemented |
TT0230 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,238 | $3,200 | Implemented |
TT0230 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,661 | $1,618 | Implemented |
TT0230 # 08 Y:2019 | 08 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $289 | $20 | Implemented |
TT0230 # 01 Y:2019 | 01 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $37,500 | $0 | Implemented |
TT0230 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,935 | $39,040 | Implemented |
TT0218 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $20,301 | $8,000 | Not Implemented |
TT0218 # 08 Y:2019 | 08 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,058 | $4,500 | Not Implemented |
TT0218 # 10 Y:2019 | 10 | 2019 | ELIMINATE/REDUCE AN OPERATION | $798 | $340 | Implemented |
TT0218 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $1,202 | $2,400 | Implemented |
TT0218 # 07 Y:2019 | 07 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,000 | $2,000 | Implemented |
TT0218 # 06 Y:2019 | 06 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,670 | $200 | Implemented |
TT0218 # 05 Y:2019 | 05 | 2019 | INCREASE AMOUNT OF CONDENSATE RETURNED | $5,090 | $15,000 | Implemented |
TT0218 # 03 Y:2019 | 03 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $20,902 | $30,000 | Not Implemented |
TT0218 # 02 Y:2019 | 02 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,004 | $2,150 | Implemented |
TT0218 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,090 | $85,313 | Implemented |
MI0299 # 08 Y:2016 | 08 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,889 | $2,360 | Not Implemented |
MI0299 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,054 | $9,821 | Implemented |