IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

958

matching recommendations
Reset
NAICS 313 Textile Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3021 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $531 $1,400 Not Implemented
UA3021 # 09 Y:2012 09 2012 USE OPTIMUM THICKNESS INSULATION $286 $886 Not Implemented
MZ0082 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $730 $230 Not Implemented
MZ0082 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $18,500 $17,720 Implemented
MZ0082 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $384 $1,160 Not Implemented
MZ0082 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $850 Implemented
MZ0082 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $801 $2,000 Not Implemented
MZ0082 # 06 Y:2012 06 2012 ADD AREA LIGHTING SWITCHES $2,446 $800 Not Implemented
MZ0082 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $0 $0 Not Implemented
GT0889 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,925 $1,000 Not Implemented
GT0889 # 02 Y:2012 02 2012 REPAIR OR REPLACE STEAM TRAPS $14,795 $8,500 Not Implemented
GT0889 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $4,743 $3,920 Not Implemented
GT0889 # 04 Y:2012 04 2012 REDUCE EXCESS STEAM BLEEDING $19,253 $45,075 Not Implemented
GT0889 # 05 Y:2012 05 2012 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $24,926 $6,000 Not Implemented
TT0078 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,720 $800 Implemented
TT0078 # 01 Y:2011 01 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,585 $29,500 Not Implemented
TT0078 # 02 Y:2011 02 2011 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $10,364 $5,531 Not Implemented
TT0078 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,023 $1,480 Implemented
TT0078 # 05 Y:2011 05 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $15,241 $12,500 Not Implemented
UA0066 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,215 $62,771 Implemented
UA0066 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,224 $4,767 Not Implemented
UA0066 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $22,864 $30,000 Implemented
UA0066 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,677 $640 Implemented
UA0066 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $22,848 $11,400 Implemented
UA0066 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $98,887 $13,568 Implemented