Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
958
matching recommendationsNAICS | 313 | Textile Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA3021 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $531 | $1,400 | Not Implemented |
UA3021 # 09 Y:2012 | 09 | 2012 | USE OPTIMUM THICKNESS INSULATION | $286 | $886 | Not Implemented |
MZ0082 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $730 | $230 | Not Implemented |
MZ0082 # 02 Y:2012 | 02 | 2012 | OPTIMIZE PLANT POWER FACTOR | $18,500 | $17,720 | Implemented |
MZ0082 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $384 | $1,160 | Not Implemented |
MZ0082 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,870 | $850 | Implemented |
MZ0082 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $801 | $2,000 | Not Implemented |
MZ0082 # 06 Y:2012 | 06 | 2012 | ADD AREA LIGHTING SWITCHES | $2,446 | $800 | Not Implemented |
MZ0082 # 07 Y:2012 | 07 | 2012 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $0 | $0 | Not Implemented |
GT0889 # 01 Y:2012 | 01 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,925 | $1,000 | Not Implemented |
GT0889 # 02 Y:2012 | 02 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $14,795 | $8,500 | Not Implemented |
GT0889 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $4,743 | $3,920 | Not Implemented |
GT0889 # 04 Y:2012 | 04 | 2012 | REDUCE EXCESS STEAM BLEEDING | $19,253 | $45,075 | Not Implemented |
GT0889 # 05 Y:2012 | 05 | 2012 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $24,926 | $6,000 | Not Implemented |
TT0078 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,720 | $800 | Implemented |
TT0078 # 01 Y:2011 | 01 | 2011 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $8,585 | $29,500 | Not Implemented |
TT0078 # 02 Y:2011 | 02 | 2011 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $10,364 | $5,531 | Not Implemented |
TT0078 # 03 Y:2011 | 03 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,023 | $1,480 | Implemented |
TT0078 # 05 Y:2011 | 05 | 2011 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $15,241 | $12,500 | Not Implemented |
UA0066 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,215 | $62,771 | Implemented |
UA0066 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $2,224 | $4,767 | Not Implemented |
UA0066 # 03 Y:2011 | 03 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $22,864 | $30,000 | Implemented |
UA0066 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,677 | $640 | Implemented |
UA0066 # 05 Y:2011 | 05 | 2011 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $22,848 | $11,400 | Implemented |
UA0066 # 06 Y:2011 | 06 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,887 | $13,568 | Implemented |