Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 3131 | Fiber, Yarn, and Thread Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0250 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,456 | $450 | Implemented |
UA0250 # 04 Y:2021 | 04 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $19,724 | $5,000 | Implemented |
UA0250 # 02 Y:2021 | 02 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $14,021 | $25,035 | Not Implemented |
UA0250 # 07 Y:2021 | 07 | 2021 | OPTIMIZE PLANT POWER FACTOR | $43,918 | $57,938 | Implemented |
UA0250 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,015 | $30,617 | Implemented |
UA0250 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,394 | $34,200 | Implemented |
UA0250 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,508 | $4,445 | Implemented |
UA0245 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,374 | $22,712 | Not Implemented |
UA0245 # 02 Y:2021 | 02 | 2021 | USE PHOTOCELL CONTROLS | $323 | $197 | Not Implemented |
UA0245 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,808 | $43,308 | Not Implemented |
UA0245 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,257 | $1,579 | Not Implemented |
UA0245 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,365 | $250 | Not Implemented |
UA0245 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $317 | $450 | Not Implemented |
UA0194 # 01 Y:2018 | 01 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $53,942 | $257,046 | Not Implemented |
UA0194 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,431 | $9,390 | Implemented |
UA0194 # 03 Y:2018 | 03 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $65,495 | $71,371 | Not Implemented |
UA0194 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $22,999 | $0 | Implemented |
UA0194 # 05 Y:2018 | 05 | 2018 | REPLACE BOILER | $41,312 | $190,000 | Not Implemented |
UA0194 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $380 | $1,205 | Implemented |
UA0194 # 07 Y:2018 | 07 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $18,351 | $7,494 | Not Implemented |
UA0192 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,821 | $22,134 | Not Implemented |
UA0192 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $1,298 | $366 | Not Implemented |
UA0192 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,416 | $200 | Implemented |
UA0192 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,273 | $3,165 | Implemented |
UA0192 # 05 Y:2018 | 05 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $76,893 | $19,300 | Implemented |