IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

209

matching recommendations
Reset
NAICS 31311 Fiber, Yarn, and Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0870 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,570 $1,000 Not Implemented
GT0870 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,245 $20,050 Implemented
GT0870 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $5,810 $620 Implemented
GT0870 # 05 Y:2009 05 2009 USE SYNTHETIC LUBRICANT $43,210 $0 Implemented
GT0870 # 06 Y:2009 06 2009 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $1,500 $6,399 Implemented
GT0870 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $33,910 $45,000 Implemented
GT0870 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,796 $7,656 Not Implemented
GT0867 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,318 $89,971 Not Implemented
GT0867 # 02 Y:2009 02 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,794 $4,000 Implemented
GT0867 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,426 $3,250 Implemented
GT0867 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,518 $6,000 Implemented
GT0867 # 05 Y:2009 05 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,949 $0 Not Implemented
GT0867 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,440 $0 Implemented
GT0844 # 01 Y:2007 01 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $19,992 $28,800 Not Implemented
GT0844 # 02 Y:2007 02 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $35,650 $40,000 Not Implemented
GT0844 # 03 Y:2007 03 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $71,952 $14,867 Not Implemented
GT0844 # 04 Y:2007 04 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $44,955 $10,000 Not Implemented
GT0844 # 05 Y:2007 05 2007 USE SYNTHETIC LUBRICANT $3,098 $0 Not Implemented
GT0844 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,808 $5,132 Not Implemented
GT0844 # 07 Y:2007 07 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,291 $28,172 Not Implemented
GT0844 # 08 Y:2007 08 2007 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $65,444 $81,971 Not Implemented
GT0844 # 09 Y:2007 09 2007 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $323,139 $174,963 Implemented
GT0844 # 10 Y:2007 10 2007 INSULATE BARE EQUIPMENT $10,329 $19,630 Not Implemented
GT0844 # 11 Y:2007 11 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $26,394 $20,000 Not Implemented
GT0844 # 12 Y:2007 12 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $136,209 $66,970 Not Implemented