IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 31321 Broadwoven Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0842 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $5,980 $1,603 Implemented
GT0842 # 02 Y:2007 02 2007 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $17,400 $27,000 Not Implemented
GT0842 # 07 Y:2007 07 2007 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $63,520 $7,000 Implemented
GT0842 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,470 $11,100 Not Implemented
GT0842 # 06 Y:2007 06 2007 USE WATER-BASED ADHESIVES $1,960 $0 Implemented
GT0842 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,090 $3,900 Implemented
GT0842 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $76,200 $20,000 Not Implemented
GT0842 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,060 $26,800 Not Implemented
GT0819 # 07 Y:2006 07 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $298,817 $375,000 Not Implemented
GT0819 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $82,242 $108,000 Not Implemented
GT0819 # 05 Y:2006 05 2006 USE EXISTING DAM TO GENERATE ELECTRICITY $106,850 $94,000 Implemented
GT0819 # 04 Y:2006 04 2006 DISCONNECT BALLASTS $2,735 $3,678 Implemented
GT0819 # 03 Y:2006 03 2006 UPGRADE CONTROLS ON COMPRESSORS $18,798 $5,000 Implemented
GT0819 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,030 $4,800 Implemented
GT0819 # 01 Y:2006 01 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $140,000 $10,000 Implemented
GT0819 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,620 $114,950 Not Implemented
GT0819 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,054 $214,725 Not Implemented
GT0825 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,828 $0 Not Implemented
GT0825 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,754 $182,180 Not Implemented
GT0825 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,150 $4,150 Not Implemented
GT0825 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $13,107 $1,500 Not Implemented
GT0825 # 02 Y:2006 02 2006 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $95,828 $140,000 Not Implemented
GT0767 # 06 Y:2003 06 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,712 $6,500 Not Implemented
GT0767 # 05 Y:2003 05 2003 USE OPTIMUM TEMPERATURE $9,365 $5,650 Not Implemented
GT0767 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $2,317 $298 Not Implemented