Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

76

matching recommendations
Reset
NAICS 31321 Broadwoven Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2105 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $25,163 $8,200 Implemented
CL2105 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $34,939 $1,120 Not Implemented
CL2105 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,819 $2,100 Implemented
CL2105 # 05 Y:2021 05 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $567,975 $4,358,847 Not Implemented
CL2105 # 06 Y:2021 06 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $63 $0 Implemented
CL2105 # 07 Y:2021 07 2021 USE OPTIMUM TEMPERATURE $81,375 $0 Not Implemented
CL2105 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25,046 $7,102 Not Implemented
CL2105 # 09 Y:2021 09 2021 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $24,497 $17,450 Not Implemented
CL2105 # 10 Y:2021 10 2021 REPLACE TREATED WATER WITH WELL / SURFACE WATER $2,591 $600 Implemented
CL2105 # 11 Y:2021 11 2021 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $982 $3,050 Not Implemented
CL2105 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $69,993 $55,908 Implemented
NC0613 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,628 $200 Implemented
NC0613 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,956 $81,978 Implemented
NC0613 # 07 Y:2018 07 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $27,242 $500 Not Implemented
NC0613 # 05 Y:2018 05 2018 RECOVER AND REUSE COOLING WATER $6,422 $1,500 Not Implemented
NC0613 # 09 Y:2018 09 2018 DEVELOP A REPAIR/REPLACE POLICY $2,479 $5,865 Implemented
NC0613 # 06 Y:2018 06 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,218 $500 Not Implemented
NC0613 # 08 Y:2018 08 2018 INSTALL SPECTRAL REFLECTORS / DELAMP $914 $1,700 Implemented
NC0613 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,751 $2,700 Not Implemented
NC0613 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $698 $5,976 Implemented
NC0579 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,575 $3,000 Implemented
NC0579 # 09 Y:2016 09 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,679 $230 Not Implemented
NC0579 # 11 Y:2016 11 2016 REPAIR AND ELIMINATE STEAM LEAKS $2,459 $1,000 Implemented
NC0579 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,076 $200 Implemented
NC0579 # 10 Y:2016 10 2016 REPAIR OR REPLACE STEAM TRAPS $7,750 $8,500 Implemented