IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 31323 Nonwoven Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2310 # 01 Y:2023 01 2023 USE OPTIMUM THICKNESS INSULATION $6,101 $3,005 Implemented
KS2310 # 06 Y:2023 06 2023 UPGRADE OBSOLETE EQUIPMENT $8,217 $52,431 Implemented
KS2202 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,120 $5,480 Implemented
KS2202 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,104 $45 Implemented
KS2202 # 06 Y:2022 06 2022 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,883 $4,387 Implemented
KS2202 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,798 $10,051 Implemented
KS2202 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,832 $7,155 Implemented
KS2202 # 10 Y:2022 10 2022 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $270 $490 Implemented
AS0499 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,171 $63 Implemented
AS0499 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,118 $6,351 Implemented
UA0175 # 08 Y:2017 08 2017 INSTALL TIMERS AND/OR THERMOSTATS $402 $30 Implemented
UA0175 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $42,445 $13,900 Implemented
UA0175 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,666 $32,698 Implemented
UA0175 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,831 $250 Implemented
UA0175 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $1,165 Implemented
UA0175 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,257 $390 Implemented
UA0175 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,388 $17,404 Implemented
NC0576 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,790 $3,000 Implemented
NC0576 # 02 Y:2016 02 2016 REPAIR OR REPLACE STEAM TRAPS $108,434 $80,000 Implemented
MA0755 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,196 $21,560 Implemented
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented
MA0742 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,465 $11,685 Implemented
MA0742 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,116 $9,000 Implemented
MA0742 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24,583 $5,560 Implemented
MA0742 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $38,357 $25,972 Implemented