Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 3133 | Textile and Fabric Finishing and Fabric Coating Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS033 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,549 | $7,500 | Implemented |
MAS033 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,256 | $34,000 | Not Implemented |
MAS033 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $1,224 | $730 | Not Implemented |
MAS033 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $762 | $3,450 | Not Implemented |
MA0653 # 01 Y:2009 | 01 | 2009 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $110,550 | $270,000 | Not Implemented |
MA0653 # 02 Y:2009 | 02 | 2009 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $37,210 | $68,000 | Not Implemented |
MA0653 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $16,188 | $752 | Implemented |
MA0653 # 04 Y:2009 | 04 | 2009 | CLOSE OFF UNNEEDED STEAM LINES | $3,551 | $500 | Not Implemented |
MA0653 # 05 Y:2009 | 05 | 2009 | INSULATE BARE EQUIPMENT | $2,840 | $7,510 | Implemented |
MA0653 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,375 | $6,125 | Not Implemented |
MA0599 # 06 Y:2006 | 06 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $4,260 | $1,190 | Not Implemented |
MA0599 # 07 Y:2006 | 07 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,051 | $7,865 | Implemented |
MA0599 # 08 Y:2006 | 08 | 2006 | REDUCE FLUID FLOW RATES | $2,270 | $600 | Implemented |
MA0599 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $627 | $600 | Implemented |
MA0599 # 05 Y:2006 | 05 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,780 | $12,325 | Implemented |
MA0599 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $10,010 | $5,280 | Implemented |
MA0599 # 03 Y:2006 | 03 | 2006 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $17,205 | $10,250 | Implemented |
MA0599 # 02 Y:2006 | 02 | 2006 | INSULATE BARE EQUIPMENT | $20,495 | $3,700 | Not Implemented |
MA0599 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $89,422 | $172,300 | Not Implemented |
MA0571 # 07 Y:2005 | 07 | 2005 | OPTIMIZE PLANT POWER FACTOR | $735 | $1,450 | Not Implemented |
MA0571 # 06 Y:2005 | 06 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,702 | $1,962 | Not Implemented |
MA0571 # 05 Y:2005 | 05 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,826 | $29,170 | Implemented |
MA0571 # 04 Y:2005 | 04 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $7,370 | $1,900 | Implemented |
MA0571 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,977 | $25,856 | Implemented |
MA0571 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $46,372 | $49,355 | Implemented |