IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
NAICS 31331 Textile and Fabric Finishing Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0295 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,542 $3,825 Implemented
MS0295 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,141 $223 Implemented
MS0295 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,014 $410 Not Implemented
MS0295 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $395 $48 Implemented
MA0599 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $89,422 $172,300 Not Implemented
MA0599 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,495 $3,700 Not Implemented
MA0599 # 03 Y:2006 03 2006 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,205 $10,250 Implemented
MA0599 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $10,010 $5,280 Implemented
MA0599 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,780 $12,325 Implemented
MA0599 # 06 Y:2006 06 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,260 $1,190 Not Implemented
MA0599 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,051 $7,865 Implemented
MA0599 # 08 Y:2006 08 2006 REDUCE FLUID FLOW RATES $2,270 $600 Implemented
MA0599 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $600 Implemented
MS0272 # 01 Y:2005 01 2005 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $60,336 $15,000 Not Implemented
MS0272 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,425 $3,780 Not Implemented
MS0272 # 03 Y:2005 03 2005 PAY UTILITY BILLS ON TIME $783 $0 Implemented
MS0272 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $569 $151 Implemented
MS0272 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $424 $1,495 Not Implemented
MS0272 # 06 Y:2005 06 2005 DISCONNECT BALLASTS $153 $216 Implemented
MS0272 # 07 Y:2005 07 2005 REPAIR AND ELIMINATE STEAM LEAKS $95 $19 Implemented
NC0294 # 01 Y:2004 01 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $19,084 $2,780 Implemented
NC0294 # 02 Y:2004 02 2004 ADD ADDITIONAL PRODUCTION SHIFT $17,395 $5,000 Not Implemented
NC0294 # 03 Y:2004 03 2004 REDESIGN PROCESS $9,178 $2,200 Not Implemented
NC0294 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $100 Implemented
NC0294 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,102 $9,225 Implemented