Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 314 Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0796 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $895 $200 Implemented
GT0796 # 03 Y:2004 03 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $835 $0 Implemented
GT0796 # 04 Y:2004 04 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $815 $500 Not Implemented
GT0796 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $8,427 $1,750 Not Implemented
GT0796 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,639 $9,925 Not Implemented
GT0796 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,051 $50,551 Implemented
GT0796 # 08 Y:2004 08 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $792 $1,910 Not Implemented
GT0796 # 01 Y:2004 01 2004 COMBINE UTILITY METERS $4,508 $9,000 Not Implemented
LE0185 # 05 Y:2004 05 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,720 $6,500 Not Implemented
LE0185 # 03 Y:2004 03 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,386 $6,346 Not Implemented
LE0185 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,153 $9,850 Not Implemented
LE0185 # 01 Y:2004 01 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,836 $43,080 Not Implemented
LE0185 # 02 Y:2004 02 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,144 $35,305 Not Implemented
LE0185 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,631 $76,467 Implemented
LE0185 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $915 $100 Implemented
LE0185 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $132 $300 Not Implemented
LE0185 # 06 Y:2004 06 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,297 $4,020 Not Implemented
LE0185 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $411 $1,125 Not Implemented
OK0682 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $200 Not Implemented
OK0682 # 11 Y:2004 11 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,729 $130 Not Implemented
OK0682 # 10 Y:2004 10 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,483 $1,200 Implemented
OK0682 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $132 $92 Not Implemented
OK0682 # 12 Y:2004 12 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,392 $10,000 Implemented
OK0682 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,455 $2,134 Not Implemented
OK0682 # 07 Y:2004 07 2004 UPGRADE CONTROLS ON COMPRESSORS $3,374 $15,000 Not Implemented