IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
Reset
NAICS 3141 Textile Furnishings Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0460 # 13 Y:2012 13 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $119 $11 Not Implemented
NC0440 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157,713 $165,618 Implemented
NC0440 # 02 Y:2011 02 2011 DEVELOP A REPAIR/REPLACE POLICY $15,127 $20,158 Implemented
NC0440 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,350 $800 Not Implemented
NC0440 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,025 $500 Implemented
NC0440 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,312 $8,420 Implemented
GT0883 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $1,910 $242 n/a
GT0883 # 02 Y:2011 02 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,435 $800 n/a
GT0883 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,504 $36,650 n/a
GT0883 # 04 Y:2011 04 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,385 $107,085 n/a
GT0883 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,404 $46,133 n/a
GT0883 # 06 Y:2011 06 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $42,689 $368,265 n/a
GT0883 # 07 Y:2011 07 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,194 $7,000 n/a
UD0838 # 01 Y:2011 01 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,635 $15,000 Not Implemented
UD0838 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,095 $55,000 Not Implemented
UD0838 # 03 Y:2011 03 2011 UPGRADE OBSOLETE EQUIPMENT $14,654 $20,000 Implemented
UD0838 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,238 $500 Implemented
UD0838 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,034 $7,000 Not Implemented
UD0838 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,370 $124,541 Not Implemented
UD0838 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,828 $100,000 Not Implemented
UD0838 # 08 Y:2011 08 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,630 $78,000 Not Implemented
UD0838 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,585 $15,000 Not Implemented
UD0838 # 10 Y:2011 10 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,749 $125 Implemented
SD0504 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,200 $12,725 Not Implemented
SD0504 # 02 Y:2010 02 2010 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $188,550 $211,240 Not Implemented