Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsNAICS | 3141 | Textile Furnishings Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0796 # 02 Y:2004 | 02 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $895 | $200 | Implemented |
GT0796 # 03 Y:2004 | 03 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $835 | $0 | Implemented |
GT0796 # 04 Y:2004 | 04 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $815 | $500 | Not Implemented |
GT0796 # 05 Y:2004 | 05 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $8,427 | $1,750 | Not Implemented |
GT0796 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,639 | $9,925 | Not Implemented |
GT0796 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,051 | $50,551 | Implemented |
GT0796 # 08 Y:2004 | 08 | 2004 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $792 | $1,910 | Not Implemented |
GT0796 # 01 Y:2004 | 01 | 2004 | COMBINE UTILITY METERS | $4,508 | $9,000 | Not Implemented |
OK0682 # 06 Y:2004 | 06 | 2004 | INSULATE BARE EQUIPMENT | $132 | $92 | Not Implemented |
OK0682 # 12 Y:2004 | 12 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,392 | $10,000 | Implemented |
OK0682 # 13 Y:2004 | 13 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,600 | $0 | Implemented |
OK0682 # 10 Y:2004 | 10 | 2004 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,483 | $1,200 | Implemented |
OK0682 # 11 Y:2004 | 11 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,729 | $130 | Not Implemented |
OK0682 # 01 Y:2004 | 01 | 2004 | INSTALL SET-BACK TIMERS | $1,572 | $163 | Implemented |
OK0682 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $906 | $6,187 | Not Implemented |
OK0682 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96 | $200 | Not Implemented |
OK0682 # 08 Y:2004 | 08 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,455 | $2,134 | Not Implemented |
OK0682 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $892 | $438 | Implemented |
OK0682 # 07 Y:2004 | 07 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $3,374 | $15,000 | Not Implemented |
OK0682 # 04 Y:2004 | 04 | 2004 | INSTALL OCCUPANCY SENSORS | $738 | $682 | Implemented |
OK0682 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $419 | $3,000 | Implemented |
MS0244 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,485 | $247 | Implemented |
MS0244 # 06 Y:2004 | 06 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,141 | $0 | Not Implemented |
MS0244 # 07 Y:2004 | 07 | 2004 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,004 | $0 | Implemented |
MS0244 # 08 Y:2004 | 08 | 2004 | AIR CONDITION ONLY SPACE NECESSARY | $1,009 | $400 | Not Implemented |