IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
NAICS 31411 Carpet and Rug Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0883 # 06 Y:2011 06 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $42,689 $368,265 n/a
GT0883 # 07 Y:2011 07 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,194 $7,000 n/a
GT0876 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,786 $1,500 Implemented
GT0876 # 02 Y:2010 02 2010 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $307 $50 Not Implemented
GT0876 # 03 Y:2010 03 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,989 $10,500 Not Implemented
GT0876 # 04 Y:2010 04 2010 REPAIR AND ELIMINATE STEAM LEAKS $1,027 $300 Implemented
GT0876 # 05 Y:2010 05 2010 USE OPTIMUM TEMPERATURE $103,726 $187,530 Implemented
GT0876 # 06 Y:2010 06 2010 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,041 $20,000 Not Implemented
GT0846 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $61,777 $40,000 Implemented
GT0846 # 02 Y:2008 02 2008 USE MINIMUM STEAM OPERATING PRESSURE $16,146 $15,536 Implemented
GT0846 # 03 Y:2008 03 2008 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $830 $1,094 Not Implemented
GT0846 # 04 Y:2008 04 2008 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,989 $26,900 Not Implemented
GT0846 # 05 Y:2008 05 2008 HEAT WATER WITH EXHAUST HEAT $551,313 $130,000 Not Implemented
GT0846 # 06 Y:2008 06 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $59,040 $65,000 Implemented
GT0846 # 07 Y:2008 07 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $155,720 $30,000 Implemented
GT0846 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,504 $70,103 Implemented
GT0846 # 09 Y:2008 09 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,206 $35,000 Not Implemented
GT0838 # 01 Y:2007 01 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,825 $10,000 Not Implemented
GT0838 # 02 Y:2007 02 2007 USE MINIMUM SAFE OVEN VENTILATION $5,955 $6,000 Not Implemented
GT0838 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,976 $0 Not Implemented
GT0838 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,908 $0 Not Implemented
GT0838 # 05 Y:2007 05 2007 USE MINIMUM STEAM OPERATING PRESSURE $17,020 $0 Not Implemented
GT0838 # 06 Y:2007 06 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $1,288 $3,975 Not Implemented
GT0838 # 07 Y:2007 07 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,338 $2,250 Not Implemented
GT0838 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,896 $127,725 Not Implemented