IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

246

matching recommendations
Reset
NAICS 3149 Other Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0185 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $132 $300 Not Implemented
LE0185 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,631 $76,467 Implemented
WI0447 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $62,019 $150,000 Not Implemented
WI0447 # 02 Y:2003 02 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,058 $4,500 Implemented
WI0447 # 03 Y:2003 03 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,071 $2,000 Not Implemented
WI0447 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $381 $740 Not Implemented
WI0447 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,938 $2,600 Implemented
TA0056 # 01 Y:2003 01 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $190,000 $141,875 Not Implemented
TA0056 # 02 Y:2003 02 2003 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $13,500 $1,075 Not Implemented
TA0056 # 03 Y:2003 03 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,726 $0 Implemented
TA0056 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $880 $325 Implemented
TA0056 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $770 $0 Implemented
TA0056 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $1,128 Implemented
LL0155 # 01 Y:2003 01 2003 REPLACE BOILER $17,740 $33,000 Not Implemented
LL0155 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,929 $975 Implemented
LL0155 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $1,265 $262 Implemented
LL0155 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $839 $75 Not Implemented
LL0155 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $712 $756 Not Implemented
LL0155 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $518 $364 Implemented
LL0155 # 07 Y:2003 07 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $25,317 $13,100 Implemented
LL0155 # 08 Y:2003 08 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,006 $186 Implemented