IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 314994 Rope, Cordage, Twine, Tire Cord, and Tire Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2419 # 01 Y:2024 01 2024 IMPROVE SPACE COMFORT CONDITIONING $6,299 $17,640 n/a
LS2419 # 04 Y:2024 04 2024 UPGRADE OBSOLETE EQUIPMENT $56,850 $580,000 n/a
LS2419 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $38,616 $514,800 n/a
LS2419 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,609 $51,689 n/a
LS2419 # 02 Y:2024 02 2024 USE OTHER WASTE CONCENTRATION METHODS $50,241 $154,466 n/a
UW2301 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $82 $344 Implemented
UW2301 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,523 $16,133 Implemented
UW2301 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,976 $295 Not Implemented
UW2301 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $729 $0 Not Implemented
UW2301 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,590 $77,405 Not Implemented
OK0784 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,104 $0 Implemented
OK0784 # 02 Y:2009 02 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $26,522 $23,859 Implemented
OK0784 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $32,802 $10,627 Implemented
OK0784 # 03 Y:2009 03 2009 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $11,003 $0 Not Implemented
OK0784 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $858 $990 Implemented
OK0784 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $362 $1,013 Not Implemented
OK0784 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $888 $1,098 Not Implemented
OK0784 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,788 $0 Implemented
OK0784 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $1,600 $620 Not Implemented
SU0278 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25,359 $0 Implemented
SU0278 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,305 $528 Implemented
SU0278 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,615 $410 Implemented
SU0278 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $44,212 $7,299 Implemented
SU0278 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $1,289 $1,820 Not Implemented
SU0278 # 09 Y:2009 09 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $112 $271 Not Implemented