Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

398

matching recommendations
Reset
NAICS 315 Apparel Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0246 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,628 $3,000 n/a
UU0246 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $8,970 $42,406 n/a
UU0246 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $439 $900 n/a
UU0246 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $123 n/a
UU0246 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,731 $338 n/a
UU0246 # 07 Y:2024 07 2024 USE AUTOMATIC FLOW CONTROL $4,727 $4,633 n/a
UU0246 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $3,514 $9,000 n/a
UU0211 # 01 Y:2023 01 2023 REPLACE BOILER $24,600 $111,300 Implemented
UU0211 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $2,330 $6,230 Not Implemented
UU0211 # 03 Y:2023 03 2023 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $7,263 $12,600 Not Implemented
UU0211 # 04 Y:2023 04 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,351 $26,250 Implemented
UU0211 # 02 Y:2023 02 2023 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,030 $18,300 Not Implemented
UU0211 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $433 $3,100 Not Implemented
SF0588 # 01 Y:2022 01 2022 INSULATE BARE EQUIPMENT $8,477 $5,558 Implemented
SF0588 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $28,848 $137,044 Not Implemented
SF0588 # 04 Y:2022 04 2022 COMBINE UTILITY METERS $7,304 $15,000 Not Implemented
SF0588 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,344 $4,967 Implemented
SF0588 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $621 $1,515 Implemented
DL0199 # 13 Y:2021 13 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,579 $2,106 Implemented
DL0199 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,657 $1,514 Implemented
DL0199 # 12 Y:2021 12 2021 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $10,836 $5,559 Not Implemented
DL0199 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $341 $805 Not Implemented
DL0199 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,226 $0 Implemented
DL0199 # 11 Y:2021 11 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,626 $20,387 Not Implemented
DL0199 # 10 Y:2021 10 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,675 $7,837 Not Implemented