Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
398
matching recommendationsNAICS | 315 | Apparel Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1905 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $260 | $825 | Implemented |
LE0480 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $418 | $35 | Implemented |
LE0480 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,513 | $4,500 | Not Implemented |
LE0480 # 03 Y:2019 | 03 | 2019 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,440 | $10,500 | Not Implemented |
LE0480 # 04 Y:2019 | 04 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $19,566 | $96,000 | Not Implemented |
LE0480 # 05 Y:2019 | 05 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,054 | $16,000 | Not Implemented |
LE0480 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,546 | $107,988 | Implemented |
UA0204 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $66,234 | $104,269 | Implemented |
UA0204 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $238 | $145 | Not Implemented |
UA0204 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,219 | $250 | Implemented |
UA0204 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,537 | $1,285 | Implemented |
UA0204 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $439 | $1,082 | Implemented |
MI0341 # 12 Y:2018 | 12 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $803 | $1,560 | Not Implemented |
MI0341 # 11 Y:2018 | 11 | 2018 | INSTALL OCCUPANCY SENSORS | $3,246 | $2,109 | Not Implemented |
MI0341 # 10 Y:2018 | 10 | 2018 | OPTIMIZE PLANT POWER FACTOR | $17,936 | $25,045 | Not Implemented |
MI0341 # 09 Y:2018 | 09 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $24,956 | $7,314 | Not Implemented |
MI0341 # 08 Y:2018 | 08 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,872 | $3,380 | Not Implemented |
MI0341 # 07 Y:2018 | 07 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,466 | $38,639 | Not Implemented |
MI0341 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,910 | $35,323 | Not Implemented |
MI0341 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,949 | $6,410 | Not Implemented |
MI0341 # 04 Y:2018 | 04 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $59,009 | $48,268 | Not Implemented |
MI0341 # 03 Y:2018 | 03 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $69,002 | $300,000 | Not Implemented |
MI0341 # 02 Y:2018 | 02 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $75,087 | $115,295 | Not Implemented |
MI0341 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $142,227 | $2,030 | Not Implemented |
UK1712 # 12 Y:2017 | 12 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $905 | $1,053 | Not Implemented |