IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

398

matching recommendations
Reset
NAICS 315 Apparel Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0547 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $3,947 $2,800 Implemented
NC0547 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $2,433 $11,840 Implemented
NC0547 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $883 $500 Not Implemented
NC0547 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $88 $100 Not Implemented
NC0547 # 09 Y:2015 09 2015 REDESIGN PROCESS $461 $2,000 Not Implemented
NC0547 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $2,028 $4,256 Implemented
NC0547 # 11 Y:2015 11 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,688 $281 Implemented
NC0547 # 12 Y:2015 12 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $231 $1,000 Implemented
NC0547 # 13 Y:2015 13 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $675 $200 Implemented
NC0521 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $123,080 $103,307 Not Implemented
NC0521 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $364,896 $1,350,000 Implemented
NC0521 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $57,030 $40,000 Implemented
NC0521 # 04 Y:2014 04 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,678 $40,000 Not Implemented
NC0521 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $41,376 $72,000 Not Implemented
NC0521 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,043 $5,100 Implemented
NC0521 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,870 $102,717 Implemented
NC0521 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,313 $650 Implemented
NC0521 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $2,162 $4,256 Implemented
UD0908 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $561 $0 Not Implemented
UD0908 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,576 $0 Not Implemented
UD0908 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,160 $1,000 Implemented
UD0908 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,164 $55,583 Not Implemented
UD0908 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,198 $1,000 Implemented
UD0908 # 06 Y:2014 06 2014 ADD AREA LIGHTING SWITCHES $4,592 $0 Implemented
UD0908 # 07 Y:2014 07 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $32,358 $66,625 Not Implemented