IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
NAICS 315 Apparel Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0272 # 05 Y:2003 05 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $351 $900 Not Implemented
NC0272 # 04 Y:2003 04 2003 USE PHOTOCELL CONTROLS $167 $235 Implemented
NC0272 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,885 $610 Implemented
NC0272 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $728 $2,803 Implemented
NC0272 # 03 Y:2003 03 2003 RECOVER AND REUSE WASTE MATERIAL $990 $400 Implemented
NC0264 # 03 Y:2003 03 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,182 $3,115 Not Implemented
NC0264 # 02 Y:2003 02 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $743 $3,100 Not Implemented
NC0264 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $126 $357 Not Implemented
NC0264 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $454 $630 Implemented
NC0264 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $463 $800 Not Implemented
NC0264 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $160 $280 Not Implemented
NC0264 # 10 Y:2003 10 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $350 Implemented
NC0264 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $100 Not Implemented
NC0264 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $152 $627 Implemented
NC0264 # 07 Y:2003 07 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,875 $500 Not Implemented
AS0361 # 05 Y:2003 05 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,290 $482 Implemented
AS0361 # 06 Y:2003 06 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,846 $1,000 Not Implemented
AS0361 # 04 Y:2003 04 2003 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,899 $17,550 Not Implemented
AS0361 # 03 Y:2003 03 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,305 $1,400 Not Implemented
AS0361 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $30 Implemented
AS0361 # 01 Y:2003 01 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $168 $350 Implemented
MA0534 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,591 $8,425 Not Implemented
MA0534 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $19,634 $12,975 Not Implemented
MA0534 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,487 $53,950 Not Implemented
MA0534 # 02 Y:2003 02 2003 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $76,320 $57,480 Not Implemented