IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
Reset
NAICS 3151 Apparel Knitting Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0175 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,660 $6,931 Not Implemented
UU0175 # 05 Y:2021 05 2021 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,532 $6,178 Implemented
UU0175 # 01 Y:2021 01 2021 ELIMINATE/REDUCE AN OPERATION $154,852 $42,000 Implemented
UU0175 # 03 Y:2021 03 2021 REPLACE BOILER $8,979 $46,872 Implemented
UU0175 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,780 $7,027 Not Implemented
UU0175 # 02 Y:2021 02 2021 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $31,653 $35,841 Implemented
NC0642 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $505 $480 Not Implemented
NC0642 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,383 $500 Implemented
NC0642 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $214 $1,000 Not Implemented
NC0642 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,398 $120 Not Implemented
NC0642 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $401 $1,798 Not Implemented
MI0341 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,949 $6,410 Not Implemented
MI0341 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $59,009 $48,268 Not Implemented
MI0341 # 11 Y:2018 11 2018 INSTALL OCCUPANCY SENSORS $3,246 $2,109 Not Implemented
MI0341 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142,227 $2,030 Not Implemented
MI0341 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $75,087 $115,295 Not Implemented
MI0341 # 03 Y:2018 03 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $69,002 $300,000 Not Implemented
MI0341 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,466 $38,639 Not Implemented
MI0341 # 12 Y:2018 12 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $803 $1,560 Not Implemented
MI0341 # 08 Y:2018 08 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,872 $3,380 Not Implemented
MI0341 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,910 $35,323 Not Implemented
MI0341 # 10 Y:2018 10 2018 OPTIMIZE PLANT POWER FACTOR $17,936 $25,045 Not Implemented
MI0341 # 09 Y:2018 09 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,956 $7,314 Not Implemented
NC0595 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $896 $100 Implemented
NC0595 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,435 $144,553 Not Implemented