IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 315110 Hosiery and Sock Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0642 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,383 $500 Implemented
NC0595 # 04 Y:2017 04 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $3,516 $400 Implemented
NC0595 # 03 Y:2017 03 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $375 $552 Implemented
NC0595 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $896 $100 Implemented
NC0547 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $3,947 $2,800 Implemented
NC0547 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $100 Implemented
NC0547 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $2,433 $11,840 Implemented
NC0547 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $2,028 $4,256 Implemented
NC0547 # 11 Y:2015 11 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,688 $281 Implemented
NC0547 # 12 Y:2015 12 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $231 $1,000 Implemented
NC0547 # 13 Y:2015 13 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $675 $200 Implemented
NC0505 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $2,259 $4,256 Implemented
NC0505 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,993 $319 Implemented
NC0505 # 06 Y:2014 06 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,874 $200 Implemented
NC0505 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $1,108 $100 Implemented
NC0505 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,186 $100 Implemented
NC0505 # 01 Y:2014 01 2014 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,293 $200 Implemented
NC0474 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,019 $3,470 Implemented
NC0474 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,672 $100 Implemented
NC0474 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $13,419 $5,700 Implemented
NC0474 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,431 $1,000 Implemented
NC0474 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,078 $1,180 Implemented
NC0474 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,365 $52,188 Implemented
NC0474 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $93,874 $176,250 Implemented
NC0342 # 06 Y:2006 06 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $4,323 $1,000 Implemented