Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 315210 | Cut and Sew Apparel Contractors |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0272 # 05 Y:2003 | 05 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $351 | $900 | Not Implemented |
NC0272 # 04 Y:2003 | 04 | 2003 | USE PHOTOCELL CONTROLS | $167 | $235 | Implemented |
NC0272 # 03 Y:2003 | 03 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $990 | $400 | Implemented |
NC0272 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,885 | $610 | Implemented |
NC0272 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $728 | $2,803 | Implemented |
NC0264 # 01 Y:2003 | 01 | 2003 | INSTALL OCCUPANCY SENSORS | $126 | $357 | Not Implemented |
NC0264 # 10 Y:2003 | 10 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,393 | $350 | Implemented |
NC0264 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $264 | $100 | Not Implemented |
NC0264 # 08 Y:2003 | 08 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $160 | $280 | Not Implemented |
NC0264 # 07 Y:2003 | 07 | 2003 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,875 | $500 | Not Implemented |
NC0264 # 06 Y:2003 | 06 | 2003 | INSULATE BARE EQUIPMENT | $152 | $627 | Implemented |
NC0264 # 05 Y:2003 | 05 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $463 | $800 | Not Implemented |
NC0264 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $454 | $630 | Implemented |
NC0264 # 03 Y:2003 | 03 | 2003 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,182 | $3,115 | Not Implemented |
NC0264 # 02 Y:2003 | 02 | 2003 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $743 | $3,100 | Not Implemented |
AS0361 # 01 Y:2003 | 01 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $168 | $350 | Implemented |
AS0361 # 06 Y:2003 | 06 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,846 | $1,000 | Not Implemented |
AS0361 # 05 Y:2003 | 05 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $2,290 | $482 | Implemented |
AS0361 # 04 Y:2003 | 04 | 2003 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $11,899 | $17,550 | Not Implemented |
AS0361 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,305 | $1,400 | Not Implemented |
AS0361 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,025 | $30 | Implemented |
LE0153 # 08 Y:2003 | 08 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,976 | $877 | Implemented |
LE0153 # 07 Y:2003 | 07 | 2003 | INSTALL OCCUPANCY SENSORS | $766 | $75 | Implemented |
LE0153 # 06 Y:2003 | 06 | 2003 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,948 | $1,000 | Implemented |
LE0153 # 05 Y:2003 | 05 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,189 | $750 | Implemented |