IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,030

matching recommendations
Reset
NAICS 321 Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0453 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $11,370 $1,000 Not Implemented
OR0453 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,780 $6,900 Not Implemented
OR0453 # 09 Y:2004 09 2004 OPTIMIZE PLANT POWER FACTOR $3,020 $4,500 Not Implemented
WI0461 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,591 $14,685 n/a
WI0461 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $360 Implemented
WI0461 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $0 Not Implemented
WI0461 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,930 $5,784 Not Implemented
WI0461 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,681 $1,227 Not Implemented
NC0279 # 01 Y:2004 01 2004 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $3,220 $20,000 Implemented
NC0279 # 02 Y:2004 02 2004 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $25,415 $25,000 Not Implemented
NC0279 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,096 $1,875 Implemented
NC0279 # 04 Y:2004 04 2004 $59,248 $6,000 Implemented
NC0279 # 05 Y:2004 05 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,880 $9,200 Not Implemented
NC0279 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $120 Not Implemented
NC0279 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $253 $775 Not Implemented
NC0279 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $68 $80 Not Implemented
IA0337 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,090 $1,131 Implemented
IA0337 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,097 $757 Implemented
IA0337 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $151 $16 Not Implemented
IA0337 # 04 Y:2004 04 2004 UPGRADE OBSOLETE EQUIPMENT $178 $16 Not Implemented
IA0337 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $196 $532 Not Implemented
IA0337 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,587 $300 Implemented
IA0337 # 07 Y:2004 07 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,525 $15,332 Not Implemented
LE0181 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $132,275 $20,000 Not Implemented
LE0181 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,431 $2,000 Implemented