Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
566
matching recommendationsNAICS | 321 | Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0801 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $15,143 | $44,093 | n/a |
OR0801 # 02 Y:2024 | 02 | 2024 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $42,000 | $50,000 | n/a |
OR0801 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,400 | $6,763 | n/a |
OR0801 # 01 Y:2024 | 01 | 2024 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $1,848 | $0 | n/a |
OR0801 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,786 | $5,438 | n/a |
OR0801 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,884 | $92,435 | n/a |
OR0798 # 01 Y:2024 | 01 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,715 | $502 | n/a |
OR0798 # 04 Y:2024 | 04 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $19,584 | $92,392 | n/a |
OR0798 # 06 Y:2024 | 06 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $921 | $8,538 | n/a |
OR0798 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,445 | $64,276 | n/a |
OR0798 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,899 | $90,000 | n/a |
OR0798 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $733 | $2,196 | n/a |
OR0798 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,382 | $4,736 | n/a |
OR0794 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,662 | $67,250 | Not Implemented |
OR0794 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,236 | $1,629 | Not Implemented |
OR0794 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $20,545 | $92,473 | Not Implemented |
OR0794 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,287 | $5,523 | Not Implemented |
OR0794 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,153 | $7,546 | Implemented |
OR0794 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,489 | $12,623 | Implemented |
OR0785 # 01 Y:2023 | 01 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,209,151 | $28,500 | Not Implemented |
OR0785 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,141 | $4,510 | Not Implemented |
OR0785 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $4,224 | $1,583 | Not Implemented |
OR0785 # 04 Y:2023 | 04 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,475 | $16,140 | Not Implemented |
OR0785 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $323 | $0 | Implemented |
OR0778 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,010 | $8,010 | Not Implemented |