IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 321 Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0386 # 09 Y:2008 09 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,379 $396 Implemented
WV0386 # 10 Y:2008 10 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,621 $1,000 Implemented
WV0386 # 01 Y:2008 01 2008 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $140,425 $517,666 Implemented
WV0386 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,790 $0 Implemented
WV0386 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,548 $50 Implemented
WV0386 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,988 $8,450 Not Implemented
WV0386 # 13 Y:2008 13 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $139 $0 Not Implemented
WV0386 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,673 $8,525 Not Implemented
WV0386 # 04 Y:2008 04 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,586 $8,100 Not Implemented
WV0386 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,653 $920 Implemented
WV0386 # 06 Y:2008 06 2008 USE RADIANT HEATER FOR SPOT HEATING $3,371 $7,700 Not Implemented
WV0386 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $2,823 $769 Implemented
WV0386 # 12 Y:2008 12 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $884 $1,000 Implemented
UF0416 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,189 $227,490 Not Implemented
UF0416 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,708 $1,477 Implemented
UF0416 # 05 Y:2008 05 2008 DEVELOP A REPAIR/REPLACE POLICY $5,057 $0 Not Implemented
UF0416 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,217 $0 Implemented
UF0416 # 03 Y:2008 03 2008 INSTALL TIMERS AND/OR THERMOSTATS $53,629 $49,236 Not Implemented
UF0416 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70,300 $53,500 Implemented
UF0416 # 01 Y:2008 01 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $950 $4,000 Implemented
SF0365 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $447 $384 Implemented
SF0365 # 02 Y:2008 02 2008 USE PHOTOCELL CONTROLS $6,469 $11,199 Not Implemented
SF0365 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,182 $7,436 Not Implemented
SF0365 # 04 Y:2008 04 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $12,886 $68,250 Implemented
OR0537 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $10,283 $27,375 Not Implemented