IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

882

matching recommendations
Reset
NAICS 3211 Sawmills and Wood Preservation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0517 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,320 $0 Implemented
WV0517 # 04 Y:2016 04 2016 DEVELOP A REPAIR/REPLACE POLICY $5,859 $1,478 Implemented
WV0517 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $2,584 $5,000 Not Implemented
WV0517 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,573 $450 Implemented
WV0517 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $1,069 $260 Implemented
WV0517 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $959 $1,940 Not Implemented
WV0517 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $847 $60 Implemented
OR0662 # 01 Y:2015 01 2015 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $41,305 $102,204 Not Implemented
OR0662 # 02 Y:2015 02 2015 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,820 $2,500 Not Implemented
OR0662 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,567 $0 Not Implemented
OR0662 # 04 Y:2015 04 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $2,998 $864 Not Implemented
OR0662 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,683 $6,683 Implemented
OR0662 # 06 Y:2015 06 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,080 $302 Not Implemented
OR0662 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,058 $67,152 Not Implemented
BS0062 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $6,803 $1,125 Not Implemented
BS0062 # 02 Y:2015 02 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $450 $661 Not Implemented
BS0062 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $447 Implemented
BS0062 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,584 $3,035 Not Implemented
BS0062 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $629 $15 Implemented
UA0142 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $80,461 $50,000 Not Implemented
UA0142 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $42,051 $9,539 Not Implemented
UA0142 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,593 $1,295 Implemented
UA0142 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,671 $26,729 Not Implemented
UA0142 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $332 $411 Implemented
UA0142 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,421 $800 Implemented