IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

882

matching recommendations
Reset
NAICS 3211 Sawmills and Wood Preservation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0223 # 04 Y:2020 04 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $1,536 $3,806 Not Implemented
OR0729 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $14,812 $38,672 Implemented
OR0729 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,737 $17,500 Not Implemented
OR0729 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,791 $13,791 Implemented
OR0729 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,586 $8,701 Not Implemented
OR0729 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $34,870 $566,544 Not Implemented
BS0122 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,031 $14,455 Not Implemented
BS0122 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,702 $8,000 Not Implemented
BS0122 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,341 $1,630 Not Implemented
BS0122 # 04 Y:2019 04 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $882 $15 Not Implemented
BS0122 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,219 $5,725 Not Implemented
BS0122 # 06 Y:2019 06 2019 BURN A LESS EXPENSIVE GRADE OF FUEL $105,689 $93,600 Not Implemented
BS0122 # 07 Y:2019 07 2019 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $322,973 $1,002,400 Not Implemented
WV0571 # 01 Y:2019 01 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $21,112 $1,000 Implemented
WV0571 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $17,040 $19,272 Implemented
WV0571 # 03 Y:2019 03 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,334 $3,500 Implemented
WV0571 # 04 Y:2019 04 2019 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,713 $2,200 Not Implemented
WV0571 # 05 Y:2019 05 2019 UPGRADE CONTROLS ON COMPRESSORS $5,475 $8,000 Not Implemented
WV0571 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,044 $0 Implemented
WV0571 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,135 $4,150 Not Implemented
WV0571 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $3,383 $763 Implemented
WV0571 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $1,597 $8,060 Implemented
OR0708 # 01 Y:2018 01 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $40,920 $18,036 Not Implemented
OR0708 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $12,870 $46,694 Not Implemented
OR0708 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,132 $0 Not Implemented