IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

896

matching recommendations
Reset
NAICS 32111 Sawmills and Wood Preservation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0012 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,601 $8,272 Implemented
BS0012 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,998 $0 Implemented
BS0012 # 04 Y:2013 04 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,065 $8,525 Not Implemented
BS0012 # 05 Y:2013 05 2013 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $11,249 $3,500 Not Implemented
BS0012 # 06 Y:2013 06 2013 ELIMINATE/REDUCE AN OPERATION $1,098 $422 Not Implemented
BS0012 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,594 $26,100 Implemented
BS0012 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,596 $6,725 Not Implemented
BS0012 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,916 $14,075 Not Implemented
BS0012 # 10 Y:2013 10 2013 INSULATE BARE EQUIPMENT $340 $2,905 Not Implemented
TT0096 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $463 $0 Implemented
TT0096 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,193 $1,753 Not Implemented
TT0096 # 03 Y:2012 03 2012 REPAIR AND ELIMINATE STEAM LEAKS $26,105 $10,000 Implemented
TT0096 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $1,892 $1,000 Implemented
TT0096 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,900 $2,000 Not Implemented
TT0096 # 06 Y:2012 06 2012 RECOVER AND REUSE WASTE MATERIAL $330,000 $630,000 Not Implemented
BD0415 # 01 Y:2012 01 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $78,417 $20,000 Not Implemented
BD0415 # 02 Y:2012 02 2012 INSTALL TURBULATORS $28,818 $1,500 Not Implemented
BD0415 # 03 Y:2012 03 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,920 $28,550 Implemented
BD0415 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,753 $2,000 Implemented
BD0415 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,606 $19,440 Implemented
BD0415 # 06 Y:2012 06 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,468 $1,965 Not Implemented
BD0415 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,275 $20 Implemented
BD0415 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $3,023 $975 Implemented
BD0415 # 09 Y:2012 09 2012 USE PHOTOCELL CONTROLS $4,708 $540 Implemented
BD0415 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $1,239 Implemented