IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

896

matching recommendations
Reset
NAICS 32111 Sawmills and Wood Preservation
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0145 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $3,700 Not Implemented
UA0225 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,563 $12,609 Implemented
UA0225 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,568 $8,775 Implemented
UA0225 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,691 $50 Implemented
UA0225 # 04 Y:2020 04 2020 MODIFY STARTUP/SHUTDOWN TIMES $12,578 $150 Not Implemented
NC0646 # 01 Y:2020 01 2020 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $377,240 $300,000 Implemented
NC0646 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $225 $778 Not Implemented
NC0646 # 03 Y:2020 03 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $188 $83 Not Implemented
NC0646 # 04 Y:2020 04 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $694 $362 Implemented
NC0646 # 05 Y:2020 05 2020 OPTIMIZE PLANT POWER FACTOR $2,484 $7,500 Not Implemented
NC0646 # 06 Y:2020 06 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,817 $6,709 Not Implemented
UA0223 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $965 $562 Implemented
UA0223 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,828 $1,395 Implemented
UA0223 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,686 $250 Not Implemented
UA0223 # 04 Y:2020 04 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $1,536 $3,806 Not Implemented
OR0729 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $14,812 $38,672 Implemented
OR0729 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,737 $17,500 Not Implemented
OR0729 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,791 $13,791 Implemented
OR0729 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,586 $8,701 Not Implemented
OR0729 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $34,870 $566,544 Not Implemented
BS0122 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,031 $14,455 Not Implemented
BS0122 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,702 $8,000 Not Implemented
BS0122 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,341 $1,630 Not Implemented
BS0122 # 04 Y:2019 04 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $882 $15 Not Implemented
BS0122 # 05 Y:2019 05 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,219 $5,725 Not Implemented