Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 32111 | Sawmills and Wood Preservation |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0646 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $225 | $778 | Not Implemented |
NC0646 # 03 Y:2020 | 03 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $188 | $83 | Not Implemented |
NC0646 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $694 | $362 | Implemented |
NC0646 # 05 Y:2020 | 05 | 2020 | OPTIMIZE PLANT POWER FACTOR | $2,484 | $7,500 | Not Implemented |
NC0646 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,817 | $6,709 | Not Implemented |
NC0646 # 01 Y:2020 | 01 | 2020 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $377,240 | $300,000 | Implemented |
NC0442 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,227 | $300 | Implemented |
NC0442 # 07 Y:2012 | 07 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $977 | $231 | Implemented |
NC0442 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,418 | $9,330 | Implemented |
NC0442 # 05 Y:2012 | 05 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $3,045 | $6,067 | Implemented |
NC0442 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,196 | $4,425 | Implemented |
NC0442 # 03 Y:2012 | 03 | 2012 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $4,788 | $20,000 | Not Implemented |
NC0442 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $44,787 | $200,000 | Not Implemented |
NC0442 # 01 Y:2012 | 01 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,357 | $35,000 | Not Implemented |
WV0290 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,454 | $0 | Implemented |
WV0290 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,220 | $21,673 | Not Implemented |
WV0290 # 03 Y:2004 | 03 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $7,121 | $1,000 | Implemented |
WV0290 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,392 | $8,050 | Implemented |
WV0290 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,244 | $1,800 | Not Implemented |
WV0290 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,003 | $100 | Implemented |
WV0290 # 07 Y:2004 | 07 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $2,228 | $150 | Implemented |
WV0290 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,107 | $300 | Implemented |
WV0290 # 09 Y:2004 | 09 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,058 | $240 | Not Implemented |
WV0290 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $404 | $0 | Implemented |
WV0290 # 11 Y:2004 | 11 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $330 | $1,600 | Implemented |