IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
Reset
NAICS 321113 Sawmills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0366 # 03 Y:2005 03 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $9,884 $784 Implemented
UF0366 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,012 $0 Implemented
UF0366 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,761 $64,979 Implemented
UF0366 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,146 $640 Implemented
UF0366 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,852 $4,653 Implemented
UF0366 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $39,191 $15,000 Implemented
UF0366 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $11,128 $1,356 Implemented
WV0311 # 12 Y:2005 12 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $480 $158 Implemented
WV0311 # 09 Y:2005 09 2005 INSULATE BARE EQUIPMENT $1,173 $885 Implemented
WV0311 # 08 Y:2005 08 2005 REPAIR OR REPLACE STEAM TRAPS $1,475 $1,000 Implemented
WV0311 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,113 $0 Implemented
WV0311 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,839 $50 Implemented
WV0311 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,074 $5,296 Implemented
WV0311 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,268 $25 Implemented
WV0311 # 03 Y:2005 03 2005 DEVELOP A REPAIR/REPLACE POLICY $8,791 $869 Implemented
WV0311 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,082 $5,425 Implemented
TA0090 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $120 Implemented
SU0202 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,315 $0 Implemented
SU0202 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,691 $150 Implemented
SU0202 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,644 $500 Implemented
SU0202 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $5,577 $30,560 Implemented
OR0471 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,840 $4,840 Implemented
OR0471 # 02 Y:2004 02 2004 UPGRADE CONTROLS ON COMPRESSORS $22,560 $8,500 Implemented
OR0471 # 03 Y:2004 03 2004 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,600 $7,100 Implemented
OR0471 # 04 Y:2004 04 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $58,650 $10,000 Implemented