IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 321113 Sawmills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0090 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $120 Implemented
TA0090 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $910 $8 Not Implemented
TA0090 # 05 Y:2004 05 2004 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,920 $120 Not Implemented
TA0090 # 04 Y:2004 04 2004 ADOPT IN-HOUSE MATERIAL GENERATION $2,350 $0 Not Implemented
TA0090 # 03 Y:2004 03 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,490 $45,000 Not Implemented
TA0090 # 02 Y:2004 02 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $42,810 $64,000 Not Implemented
TA0090 # 01 Y:2004 01 2004 CONDENSE OPERATION INTO ONE BUILDING $91,320 $20,000 Not Implemented
OR0471 # 11 Y:2004 11 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,291 $27,750 Implemented
OR0471 # 10 Y:2004 10 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $251,508 $60,000 Not Implemented
OR0471 # 09 Y:2004 09 2004 INSTALL SENSORS TO DETECT AND AVOID JAMS $6,000 $1,000 Implemented
OR0471 # 08 Y:2004 08 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,470 $9,300 Not Implemented
OR0471 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $18,220 $20,000 Not Implemented
OR0471 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44,000 $92,000 Not Implemented
OR0471 # 05 Y:2004 05 2004 INSTALL SENSORS TO DETECT AND AVOID JAMS $102,700 $77,400 Not Implemented
OR0471 # 04 Y:2004 04 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $58,650 $10,000 Implemented
OR0471 # 03 Y:2004 03 2004 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,600 $7,100 Implemented
OR0471 # 02 Y:2004 02 2004 UPGRADE CONTROLS ON COMPRESSORS $22,560 $8,500 Implemented
OR0471 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,840 $4,840 Implemented
OR0471 # 12 Y:2004 12 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $104,895 $422,500 Not Implemented
MS0262 # 02 Y:2004 02 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $15,412 $1,518 Implemented
MS0262 # 09 Y:2004 09 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $815 $444 Implemented
MS0262 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $822 $1,969 Not Implemented
MS0262 # 07 Y:2004 07 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $918 $2,125 Implemented
MS0262 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,878 $3,710 Not Implemented
MS0262 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,490 $6,318 Not Implemented