Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsNAICS | 321113 | Sawmills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0090 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $120 | Implemented |
TA0090 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $910 | $8 | Not Implemented |
TA0090 # 05 Y:2004 | 05 | 2004 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,920 | $120 | Not Implemented |
TA0090 # 04 Y:2004 | 04 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $2,350 | $0 | Not Implemented |
TA0090 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $23,490 | $45,000 | Not Implemented |
TA0090 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $42,810 | $64,000 | Not Implemented |
TA0090 # 01 Y:2004 | 01 | 2004 | CONDENSE OPERATION INTO ONE BUILDING | $91,320 | $20,000 | Not Implemented |
OR0471 # 11 Y:2004 | 11 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,291 | $27,750 | Implemented |
OR0471 # 10 Y:2004 | 10 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $251,508 | $60,000 | Not Implemented |
OR0471 # 09 Y:2004 | 09 | 2004 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $6,000 | $1,000 | Implemented |
OR0471 # 08 Y:2004 | 08 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,470 | $9,300 | Not Implemented |
OR0471 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $18,220 | $20,000 | Not Implemented |
OR0471 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44,000 | $92,000 | Not Implemented |
OR0471 # 05 Y:2004 | 05 | 2004 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $102,700 | $77,400 | Not Implemented |
OR0471 # 04 Y:2004 | 04 | 2004 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $58,650 | $10,000 | Implemented |
OR0471 # 03 Y:2004 | 03 | 2004 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,600 | $7,100 | Implemented |
OR0471 # 02 Y:2004 | 02 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,560 | $8,500 | Implemented |
OR0471 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $4,840 | Implemented |
OR0471 # 12 Y:2004 | 12 | 2004 | INCREASE AMOUNT OF CONDENSATE RETURNED | $104,895 | $422,500 | Not Implemented |
MS0262 # 02 Y:2004 | 02 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $15,412 | $1,518 | Implemented |
MS0262 # 09 Y:2004 | 09 | 2004 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $815 | $444 | Implemented |
MS0262 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $822 | $1,969 | Not Implemented |
MS0262 # 07 Y:2004 | 07 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $918 | $2,125 | Implemented |
MS0262 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,878 | $3,710 | Not Implemented |
MS0262 # 05 Y:2004 | 05 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $9,490 | $6,318 | Not Implemented |