Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsNAICS | 321113 | Sawmills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA3031 # 09 Y:2013 | 09 | 2013 | INSTALL OCCUPANCY SENSORS | $362 | $763 | Not Implemented |
UA3031 # 01 Y:2013 | 01 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,783 | $400 | Implemented |
UA3031 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,389 | $7,400 | Implemented |
UA3031 # 03 Y:2013 | 03 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $3,045 | $23,550 | Implemented |
UA3031 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $174 | $3,355 | Not Implemented |
UA3031 # 05 Y:2013 | 05 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $85 | $609 | Not Implemented |
UA3031 # 06 Y:2013 | 06 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $15,087 | $0 | Not Implemented |
UA3031 # 07 Y:2013 | 07 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,270 | $1,654 | Implemented |
UA3031 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,244 | $4,074 | Implemented |
OR0612 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,043 | $922 | Implemented |
OR0612 # 04 Y:2013 | 04 | 2013 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,981 | $4,470 | Not Implemented |
OR0612 # 03 Y:2013 | 03 | 2013 | INSTALL OCCUPANCY SENSORS | $7,387 | $13,420 | Implemented |
OR0612 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,184 | $10,125 | Implemented |
OR0612 # 01 Y:2013 | 01 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $30,841 | $79,939 | Not Implemented |
OR0607 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $52,535 | $27,268 | Not Implemented |
OR0607 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,021 | $5,130 | Implemented |
OR0607 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,983 | $7,504 | Implemented |
OR0607 # 03 Y:2013 | 03 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,603 | $9,150 | Not Implemented |
OR0607 # 02 Y:2013 | 02 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,626 | $5,352 | Not Implemented |
OR0602 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,435 | $3,004 | Implemented |
OR0602 # 07 Y:2013 | 07 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,173 | $2,020 | Not Implemented |
OR0602 # 06 Y:2013 | 06 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,822 | $9,150 | Implemented |
OR0602 # 05 Y:2013 | 05 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,904 | $4,472 | Not Implemented |
OR0602 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $5,434 | $10,283 | Implemented |
OR0602 # 03 Y:2013 | 03 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $14,855 | $19,467 | Implemented |