IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
NAICS 321113 Sawmills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0801 # 01 Y:2024 01 2024 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $1,848 $0 n/a
OR0801 # 02 Y:2024 02 2024 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $42,000 $50,000 n/a
OR0801 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $15,143 $44,093 n/a
OR0801 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,400 $6,763 n/a
OR0801 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,786 $5,438 n/a
OR0801 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $6,884 $92,435 n/a
GT0983 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $566 $1,625 n/a
GT0983 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $101,821 $1,492,532 n/a
GT0983 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $51,238 $1,850 n/a
UW2412 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,335 $0 n/a
UW2412 # 08 Y:2024 08 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,736 $2,075 n/a
UW2412 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $8,042 $6,294 n/a
UW2412 # 06 Y:2024 06 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,451 $2,000 n/a
UW2412 # 05 Y:2024 05 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,420 $1,600 n/a
UW2412 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,336 $2,080 n/a
UW2412 # 02 Y:2024 02 2024 INSULATE BARE EQUIPMENT $815 $4,530 n/a
UW2412 # 01 Y:2024 01 2024 REPAIR OR REPLACE STEAM TRAPS $6,073 $3,600 n/a
LT8396 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,479 $1,067 n/a
LT8396 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $7,412 $31,808 n/a
LT8396 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $2,360 n/a
WV0657 # 01 Y:2024 01 2024 REPLACE BOILER $38,907 $149,240 Not Implemented
WV0657 # 02 Y:2024 02 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,406 $98,076 Not Implemented
WV0657 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,019 $3,647 Implemented
WV0657 # 04 Y:2024 04 2024 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $5,370 $18,750 Not Implemented
WV0657 # 05 Y:2024 05 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,482 $1,500 Implemented