Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
654
matching recommendationsNAICS | 3212 | Veneer, Plywood, and Engineered Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0020 # 07 Y:2024 | 07 | 2024 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,380 | $0 | n/a |
SJ0020 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,868 | $15,989 | n/a |
SJ0020 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,851 | $0 | n/a |
SJ0020 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,344 | $0 | n/a |
SJ0020 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $140,348 | $663,784 | n/a |
SJ0020 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $178 | $770 | n/a |
SJ0020 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $156 | $358 | n/a |
SJ0020 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,898 | $9,577 | n/a |
UL2403 # 08 Y:2024 | 08 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $680 | $0 | n/a |
UL2403 # 01 Y:2024 | 01 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,606 | $77,327 | n/a |
UL2403 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $32,359 | $12,025 | n/a |
UL2403 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,407 | $9,750 | n/a |
UL2403 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,498 | $1,785 | n/a |
UL2403 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,803 | $0 | n/a |
UL2403 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $181 | $779 | n/a |
UL2403 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,568 | $3,839 | n/a |
UL2403 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,533 | $548,395 | n/a |
SJ0014 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,018 | $0 | n/a |
SJ0014 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $427,760 | $693,530 | n/a |
SJ0014 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,864 | $4,784 | n/a |
SJ0014 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,211 | $1,240 | n/a |
SJ0014 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,454 | $17,634 | n/a |
SJ0014 # 08 Y:2024 | 08 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $564 | $336 | n/a |
SJ0014 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,050 | $51 | n/a |
SJ0014 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $22,822 | $3,080 | n/a |