IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

654

matching recommendations
Reset
NAICS 3212 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0765 # 09 Y:2003 09 2003 REPAIR AND ELIMINATE STEAM LEAKS $1,155 $300 Not Implemented
GT0765 # 10 Y:2003 10 2003 BURN A LESS EXPENSIVE GRADE OF FUEL $61,630 $250,000 Not Implemented
GT0765 # 11 Y:2003 11 2003 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $7,430 $12,000 Not Implemented
WV0267 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,580 $0 Not Implemented
WV0267 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,522 $2,820 Not Implemented
WV0267 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $582 $150 Implemented
WV0267 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,402 $30 Implemented
WV0267 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,185 $135 Implemented
WV0267 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $353 $395 Implemented
WV0267 # 07 Y:2003 07 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,920 $1,125 Implemented
WV0267 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,946 $0 Implemented
WV0267 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $3,148 $1,475 Implemented
WV0267 # 10 Y:2003 10 2003 OPTIMIZE PLANT POWER FACTOR $2,644 $12,320 Not Implemented
WV0267 # 11 Y:2003 11 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $684 $250 Implemented
WV0267 # 12 Y:2003 12 2003 MINIMIZE WATER USAGE $6,675 $4,000 Implemented
OR0430 # 01 Y:2003 01 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $119,450 $176,200 Not Implemented
OR0430 # 02 Y:2003 02 2003 MOVE PRODUCT USING MECHANICAL MEANS $129,340 $12,250 Not Implemented
OR0430 # 03 Y:2003 03 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $11,900 $9,300 Not Implemented
OR0430 # 04 Y:2003 04 2003 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $30,700 $17,700 Implemented
OR0430 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,810 $9,000 Implemented
OR0430 # 06 Y:2003 06 2003 UPGRADE CONTROLS ON COMPRESSORS $11,350 $2,000 Implemented
OR0430 # 07 Y:2003 07 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,950 $3,100 Not Implemented
OR0430 # 08 Y:2003 08 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $8,830 $14,600 Implemented
OR0430 # 09 Y:2003 09 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,840 $1,270 Implemented
OR0430 # 10 Y:2003 10 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $816 $0 Not Implemented