IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

646

matching recommendations
Reset
NAICS 3212 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0628 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $200 Implemented
NC0628 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $45 $100 Not Implemented
NC0628 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,628 $15,967 Not Implemented
NC0624 # 05 Y:2019 05 2019 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,555 $2,000 Not Implemented
NC0624 # 04 Y:2019 04 2019 AVOID REWINDING MOTORS MORE THAN TWICE $39,622 $58,313 Not Implemented
NC0624 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $107 $450 Not Implemented
NC0624 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,403 $200 Not Implemented
NC0624 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,704 $24,212 Not Implemented
OK0989 # 05 Y:2018 05 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $616 $5,983 Not Implemented
OK0989 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,730 $13,456 Implemented
OK0989 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,686 $6,881 Implemented
OK0989 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $184,161 $201,131 Implemented
OK0989 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,205 $944 Not Implemented
OR0701 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,441 $4,175 Not Implemented
OR0701 # 03 Y:2018 03 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $11,954 $11,773 Not Implemented
OR0701 # 02 Y:2018 02 2018 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $17,929 $8,549 Not Implemented
OR0701 # 01 Y:2018 01 2018 INSTALL SYSTEM TO COLLECT SCRAP $35,903 $29,900 Not Implemented
NC0610 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,309 $135,942 Implemented
NC0610 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,172 $200 Implemented
NC0610 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,006 $1,350 Not Implemented
NC0610 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $981 $100 Not Implemented
NC0610 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,293 $10,000 Implemented
NC0610 # 06 Y:2018 06 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,484 $10,000 Implemented
NC0610 # 07 Y:2018 07 2018 DEVELOP A REPAIR/REPLACE POLICY $1,934 $5,865 Implemented
BS0091 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,778 $17,240 Not Implemented