IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

654

matching recommendations
Reset
NAICS 3212 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0050 # 05 Y:2014 05 2014 INSTALL OCCUPANCY SENSORS $887 $1,575 Not Implemented
WM0050 # 06 Y:2014 06 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,302 $2,100 Not Implemented
WM0050 # 07 Y:2014 07 2014 SELL COMBUSTIBLE WASTE $39,202 $97,000 Not Implemented
WM0050 # 08 Y:2014 08 2014 UPGRADE CONTROLS ON COMPRESSORS $1,111 $0 Not Implemented
OR0639 # 01 Y:2014 01 2014 IMPROVE COMBUSTION CONTROL CAPABILITY $14,677 $12,315 Implemented
OR0639 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,461 $360 Implemented
OR0639 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,572 $7,500 Not Implemented
OR0639 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $7,377 $7,643 Implemented
OR0639 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $3,528 $15,201 Not Implemented
OR0638 # 01 Y:2014 01 2014 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $237,276 $62,840 Not Implemented
OR0638 # 02 Y:2014 02 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $28,255 $27,375 Not Implemented
OR0638 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,466 $8,550 Not Implemented
OR0638 # 04 Y:2014 04 2014 MINIMIZE WATER USAGE $1,003 $0 Implemented
OR0638 # 05 Y:2014 05 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,008 $9,020 Not Implemented
OR0638 # 06 Y:2014 06 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,207 $13,800 Not Implemented
OR0638 # 07 Y:2014 07 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,180 $10,000 Implemented
OR0635 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,475 $7,174 Not Implemented
OR0635 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,287 $1,628 Not Implemented
OR0635 # 03 Y:2014 03 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $56,191 $56,191 Not Implemented
OR0635 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,844 $15,843 Not Implemented
OR0635 # 05 Y:2014 05 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,961 $9,068 Not Implemented
OR0635 # 06 Y:2014 06 2014 INSTALL SPECTRAL REFLECTORS / DELAMP $181,002 $170,561 Not Implemented
OR0635 # 07 Y:2014 07 2014 UPGRADE CONTROLS ON COMPRESSORS $40,819 $43,800 Not Implemented
OR0633 # 01 Y:2014 01 2014 UPGRADE CONTROLS ON COMPRESSORS $107,219 $4,630 Not Implemented
OR0633 # 02 Y:2014 02 2014 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $392,710 $105,114 Not Implemented