IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
NAICS 3212 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0399 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $154,014 $106,000 Not Implemented
WV0399 # 01 Y:2010 01 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $215,411 $540,000 Not Implemented
WV0399 # 13 Y:2010 13 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,498 $4,153 Not Implemented
WV0399 # 12 Y:2010 12 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,246 $26 Not Implemented
WV0399 # 11 Y:2010 11 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,309 $4,560 Not Implemented
WV0399 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $2,955 $3,544 Implemented
WV0399 # 09 Y:2010 09 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,930 $1,000 Implemented
WV0399 # 08 Y:2010 08 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,515 $1,717 Implemented
WV0399 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,889 $0 Implemented
WV0399 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,812 $0 Implemented
WV0399 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $18,121 $1,644 Implemented
WV0399 # 04 Y:2010 04 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,930 $39,900 Implemented
WV0399 # 03 Y:2010 03 2010 COVER OPEN TANKS $83,144 $7,290 Implemented
WV0304 # 01 Y:2004 01 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $83,144 $1,360 Not Implemented
WV0304 # 02 Y:2004 02 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,964 $2,752 Implemented
WV0304 # 11 Y:2004 11 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $418 $154 Implemented
WV0304 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $11,373 $220 Not Implemented
WV0304 # 07 Y:2004 07 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,535 $44 Not Implemented
WV0304 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,328 $271 Not Implemented
WV0304 # 10 Y:2004 10 2004 INSULATE BARE EQUIPMENT $509 $44 Implemented
WV0304 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,376 $0 Implemented
WV0304 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $5,483 $4,491 Implemented
WV0304 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,051 $210 Implemented
WV0304 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,679 $22 Implemented
WV0267 # 10 Y:2003 10 2003 OPTIMIZE PLANT POWER FACTOR $2,644 $12,320 Not Implemented