IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 321211 Hardwood Veneer and Plywood Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0610 # 07 Y:2018 07 2018 DEVELOP A REPAIR/REPLACE POLICY $1,934 $5,865 Implemented
NC0610 # 06 Y:2018 06 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,484 $10,000 Implemented
NC0610 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,293 $10,000 Implemented
NC0610 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $981 $100 Not Implemented
NC0610 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,006 $1,350 Not Implemented
NC0610 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,172 $200 Implemented
NC0610 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,309 $135,942 Implemented
NC0512 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $35,127 $9,720 Not Implemented
NC0512 # 11 Y:2014 11 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $440 $560 Not Implemented
NC0512 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $642 $944 Not Implemented
NC0512 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $1,605 Not Implemented
NC0512 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,636 $43,944 Not Implemented
NC0512 # 06 Y:2014 06 2014 DEVELOP A REPAIR/REPLACE POLICY $36,114 $73,589 Not Implemented
NC0512 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,361 $100 Implemented
NC0512 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $11,341 $100 Not Implemented
NC0512 # 03 Y:2014 03 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,504 $22,000 Not Implemented
NC0512 # 02 Y:2014 02 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,621 $0 Not Implemented
NC0512 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,691 $50 Not Implemented
NC0463 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $15,737 $15,000 Not Implemented
NC0463 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,367 $5,000 Implemented
NC0463 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24 $135 Not Implemented
NC0463 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,015 $1,124 Implemented
NC0463 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,208 $200 Implemented
NC0463 # 02 Y:2012 02 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,159 $1,400 Implemented