Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 321211 | Hardwood Veneer and Plywood Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0260 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $90,617 | $35,347 | Implemented |
UA0260 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,000 | $1,784 | Not Implemented |
UA0260 # 04 Y:2022 | 04 | 2022 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $230,787 | $328,350 | Not Implemented |
UA0260 # 02 Y:2022 | 02 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,710 | $1,651 | Implemented |
UA0260 # 03 Y:2022 | 03 | 2022 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $429,299 | $2,825,211 | Not Implemented |
UA0260 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,881 | $1,000 | Not Implemented |
OR0750 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $49,792 | $155,954 | Not Implemented |
OR0750 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,128 | $0 | Not Implemented |
OR0750 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,607 | $0 | Not Implemented |
OR0750 # 03 Y:2022 | 03 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $32,591 | $4,338 | Not Implemented |
OR0750 # 04 Y:2022 | 04 | 2022 | INCREASE USE OF AUTOMATION | $149,543 | $65,909 | Not Implemented |
OR0750 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $87,087 | $87,086 | Not Implemented |
OR0728 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,023 | $34,574 | Not Implemented |
OR0728 # 02 Y:2019 | 02 | 2019 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $29,427 | $34,054 | Not Implemented |
OR0728 # 03 Y:2019 | 03 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,174 | $4,152 | Not Implemented |
OR0728 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,008 | $0 | Implemented |
IP0120 # 09 Y:2019 | 09 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $691 | $3,215 | Implemented |
IP0120 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,145 | $4 | Implemented |
IP0120 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,278 | $7,549 | Not Implemented |
IP0120 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,019 | $4,963 | Implemented |
IP0120 # 06 Y:2019 | 06 | 2019 | OPTIMIZE PLANT POWER FACTOR | $9,284 | $11,128 | Not Implemented |
IP0120 # 05 Y:2019 | 05 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $473 | $256 | Implemented |
IP0120 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $223 | $22 | Implemented |
IP0120 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $348 | $0 | Not Implemented |
IP0120 # 02 Y:2019 | 02 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $835 | $0 | Implemented |