IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
NAICS 321219 Reconstituted Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0486 # 08 Y:2005 08 2005 REDUCE OR ELIMINATE WASTE $4,680 $65 Not Implemented
OR0486 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $3,350 $3,050 Implemented
OR0486 # 10 Y:2005 10 2005 $25,000 $49,000 Implemented
OR0486 # 11 Y:2005 11 2005 USE PHOTOCELL CONTROLS $2,700 $1,300 Implemented
OR0486 # 12 Y:2005 12 2005 INSULATE FEEDWATER TANK $1,800 $1,500 Implemented
LL0237 # 01 Y:2005 01 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $3,092,622 $0 Not Implemented
LL0237 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $46,200 $2,600 Implemented
LL0237 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $51,555 $15,000 Implemented
LL0237 # 04 Y:2005 04 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,402 $1,400 Implemented
LL0237 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $22,793 $0 Not Implemented
LL0237 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,071 $0 Not Implemented
LL0237 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $1,195 $0 Not Implemented
LL0237 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,527 $1,930 Implemented
OR0485 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,420 $6,500 Not Implemented
OR0485 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,180 $0 Not Implemented
OR0485 # 03 Y:2005 03 2005 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $6,760 $15,400 Not Implemented
OR0485 # 04 Y:2005 04 2005 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $64,700 $19,500 Not Implemented
OR0485 # 05 Y:2005 05 2005 OPTIMIZE PLANT POWER FACTOR $13,480 $12,250 Not Implemented
OR0485 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,250 $0 Not Implemented
OR0485 # 07 Y:2005 07 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $64,000 $134,000 Not Implemented
OR0485 # 08 Y:2005 08 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $735 $2,410 Not Implemented
MA0565 # 01 Y:2004 01 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $216,000 $125,000 Implemented
MA0565 # 02 Y:2004 02 2004 $57,540 $40,000 Implemented
MA0565 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,088 $8,000 Not Implemented
MA0565 # 04 Y:2004 04 2004 REPLACE BOILER $2,760 $750 Implemented