Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 3219 | Other Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0386 # 12 Y:2008 | 12 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $884 | $1,000 | Implemented |
WV0386 # 11 Y:2008 | 11 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,548 | $50 | Implemented |
WV0386 # 10 Y:2008 | 10 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,621 | $1,000 | Implemented |
WV0386 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,379 | $396 | Implemented |
WV0386 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,790 | $0 | Implemented |
WV0386 # 07 Y:2008 | 07 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,823 | $769 | Implemented |
WV0386 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $4,653 | $920 | Implemented |
WV0386 # 01 Y:2008 | 01 | 2008 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $140,425 | $517,666 | Implemented |
SF0365 # 01 Y:2008 | 01 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $447 | $384 | Implemented |
SF0365 # 04 Y:2008 | 04 | 2008 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,886 | $68,250 | Implemented |
OR0533 # 05 Y:2008 | 05 | 2008 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $8,300 | $2,500 | Implemented |
OR0533 # 01 Y:2008 | 01 | 2008 | REDUCE SCRAP PRODUCTION | $34,537 | $0 | Implemented |
UM0340 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $329 | $500 | Implemented |
UM0340 # 01 Y:2008 | 01 | 2008 | OPTIMIZE PLANT POWER FACTOR | $15,424 | $32,000 | Implemented |
WV0381 # 12 Y:2008 | 12 | 2008 | INSTALL SET-BACK TIMERS | $6,981 | $1,150 | Implemented |
WV0381 # 11 Y:2008 | 11 | 2008 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $7,681 | $10,660 | Implemented |
WV0381 # 08 Y:2008 | 08 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $21,259 | $25,425 | Implemented |
WV0381 # 07 Y:2008 | 07 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,395 | $2,100 | Implemented |
WV0381 # 06 Y:2008 | 06 | 2008 | OPTIMIZE PLANT POWER FACTOR | $25,696 | $34,550 | Implemented |
WV0381 # 05 Y:2008 | 05 | 2008 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $28,475 | $76,200 | Implemented |
WV0381 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,296 | $19,992 | Implemented |
BD0345 # 06 Y:2008 | 06 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $3,422 | $10,592 | Implemented |
BD0345 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,343 | $1,000 | Implemented |
BD0345 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $330 | $300 | Implemented |
BD0345 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $324 | $550 | Implemented |