IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,544

matching recommendations
Reset
NAICS 3219 Other Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0548 # 11 Y:2017 11 2017 DEVELOP A REPAIR/REPLACE POLICY $1,024 $699 Implemented
WV0548 # 12 Y:2017 12 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $863 $431 Implemented
WV0548 # 13 Y:2017 13 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $260 $850 Implemented
OR0686 # 01 Y:2017 01 2017 DEVELOP STANDARD OPERATING PROCEDURES $181,947 $31,400 Not Implemented
OR0686 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,219 $0 Not Implemented
OR0686 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,997 $1,200 Not Implemented
OR0686 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,155 $0 Not Implemented
OR0686 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,115 $16,115 Not Implemented
OR0686 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,743 $500 Not Implemented
TT0189 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,177 $3,050 Implemented
TT0189 # 02 Y:2017 02 2017 UPGRADE CONTROLS ON COMPRESSORS $11,026 $14,000 Not Implemented
TT0189 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,767 $4,837 Implemented
TT0189 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,128 $125 Not Implemented
TT0189 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $864 $2,140 Implemented
TT0189 # 06 Y:2017 06 2017 REDUCE EXCESS STEAM BLEEDING $224 $225 Not Implemented
UA0176 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $29,064 $1,800 Implemented
UA0176 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $9,077 $16,027 Implemented
UA0176 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,883 $34,772 Not Implemented
UA0176 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,678 $38,382 Not Implemented
UA0176 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,273 $2,645 Implemented
UA0176 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,859 $400 Not Implemented
UA0176 # 07 Y:2017 07 2017 MODIFY STARTUP/SHUTDOWN TIMES $1,804 $0 Not Implemented
BS0090 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,027 $1,820 Implemented
BS0090 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $2,653 Implemented
BS0090 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,077 $2,600 Not Implemented