IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,548

matching recommendations
Reset
NAICS 3219 Other Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0137 # 04 Y:2014 04 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,191 $5,200 Not Implemented
TT0137 # 05 Y:2014 05 2014 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $26,063 $4,272 Implemented
WM0049 # 01 Y:2014 01 2014 REDESIGN PROCESS $84,202 $409,525 Not Implemented
WM0049 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,079 $0 Implemented
WM0049 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,995 $44,750 Not Implemented
WM0049 # 04 Y:2014 04 2014 USE POWER DURING OFF-PEAK PERIODS $1,567 $0 Implemented
WM0049 # 05 Y:2014 05 2014 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,012 $2,000 Not Implemented
WM0049 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $940 $760 Not Implemented
WM0049 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,676 $9,434 Not Implemented
WM0049 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,292 $5,348 Not Implemented
WM0049 # 09 Y:2014 09 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,969 $41,765 Implemented
WM0049 # 10 Y:2014 10 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,788 $1,290 Implemented
WM0049 # 11 Y:2014 11 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,253 $3,096 Implemented
WM0049 # 12 Y:2014 12 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $81,231 $200,000 Not Implemented
UM0442 # 01 Y:2014 01 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $143,338 $477,600 Not Implemented
UM0442 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,315 $40,000 Implemented
UM0442 # 03 Y:2014 03 2014 USE MINIMUM STEAM OPERATING PRESSURE $10,229 $5,000 Implemented
UM0442 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $4,900 $3,000 Implemented
NC0508 # 01 Y:2014 01 2014 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $9,684 $2,200 Implemented
NC0508 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $865 $100 Implemented
NC0508 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,274 $1,950 Not Implemented
NC0508 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,952 $2,300 Implemented
NC0508 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,695 $28,977 Implemented
NC0508 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $520 $4,006 Not Implemented
NC0508 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,026 $240 Implemented