IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,548

matching recommendations
Reset
NAICS 3219 Other Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0466 # 11 Y:2013 11 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,129 $5,550 Not Implemented
WV0466 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,001 $113 Implemented
WV0466 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $477 $470 Implemented
UK1216 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,607 $4,607 Implemented
UK1216 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,150 $1,000 Implemented
UK1216 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $145,660 $993,792 Implemented
UK1216 # 04 Y:2013 04 2013 REPAIR AND ELIMINATE STEAM LEAKS $31,294 $26,400 Implemented
AM0633 # 01 Y:2013 01 2013 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $143,455 $102,715 Not Implemented
AM0633 # 02 Y:2013 02 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $17,500 $800 Implemented
AM0633 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $10,090 $12,690 Implemented
AM0633 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $520 $160 Implemented
AM0633 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,100 $16 Not Implemented
AM0633 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,420 $1,000 Implemented
AM0633 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $780 $0 Implemented
AM0633 # 08 Y:2013 08 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $245 $0 Implemented
TT0104 # 01 Y:2013 01 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $382 $50 Not Implemented
TT0104 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $13,653 $5,720 Implemented
TT0104 # 03 Y:2013 03 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $8,455 $13,594 Implemented
TT0104 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,565 $16,000 Not Implemented
OK0836 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,500 $1,700 Not Implemented
OK0836 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,200 $27,500 Not Implemented
OK0836 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,400 $10,000 Implemented
OK0836 # 04 Y:2012 04 2012 UPGRADE CONTROLS ON COMPRESSORS $28,900 $15,100 Implemented
OK0836 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,000 $500 Implemented
OK0836 # 06 Y:2012 06 2012 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $7,200 $1,000 Implemented