Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,548
matching recommendationsNAICS | 3219 | Other Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0519 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,189 | $17,273 | Implemented |
AS0519 # 05 Y:2022 | 05 | 2022 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,322 | $7,738 | Implemented |
AS0519 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $3,455 | Implemented |
AS0519 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $352 | $830 | Implemented |
OR0739 # 01 Y:2021 | 01 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,888 | $0 | Implemented |
OR0739 # 02 Y:2021 | 02 | 2021 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $12,852 | $1,794 | Not Implemented |
OR0739 # 03 Y:2021 | 03 | 2021 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $11,419 | $32,321 | Not Implemented |
LS2113 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,608 | $50 | Not Implemented |
LS2113 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,312 | $318 | Not Implemented |
LS2113 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,491 | $585 | Implemented |
LS2113 # 04 Y:2021 | 04 | 2021 | INSTALL OCCUPANCY SENSORS | $2,236 | $646 | Not Implemented |
LS2113 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,876 | $16,200 | Not Implemented |
LS2113 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,512 | $6,847 | Implemented |
LE0511 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $824 | $35 | Not Implemented |
LE0511 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,197 | $14,875 | Implemented |
LE0511 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,917 | $8,000 | Not Implemented |
LE0511 # 04 Y:2021 | 04 | 2021 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $2,375 | $7,600 | Not Implemented |
LE0511 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $289 | $1,000 | Not Implemented |
LE0511 # 06 Y:2021 | 06 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,092 | $12,000 | Not Implemented |
LE0511 # 07 Y:2021 | 07 | 2021 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $1,243 | $6,000 | Not Implemented |
BS0149 # 01 Y:2021 | 01 | 2021 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $9,819 | $23 | Not Implemented |
BS0149 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,317 | $313 | Not Implemented |
BS0149 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $23,678 | $1,000 | Not Implemented |
BS0149 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,150 | $13,435 | Not Implemented |
BS0149 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,525 | $50 | Not Implemented |